Guide

THE TOOLBOX / DECKS, FENCES & MASONRY

Sonotube & Post-Hole Concrete Calculator —
50/60/80-lb Bag Counts, Cubic Yards & Wood Post Displacement.

Calculate exact 50-lb, 60-lb, or 80-lb concrete bags, cubic yards, and mixing water for cylindrical Sonotube deck footings or fence post holes—automatically subtracting 4×4 or 6×6 post displacement.

80-lb Concrete Bags

31 bags

Includes 10% over-dig buffer

Total Concrete Volume

0.67 yd³

18.1 ft³ (2.75 ft³/hole)

Est. Material Cost

$209

At $6.75 / bag

Mixing Water Needed

~23.3 gal

Keep mix stiff — avoid soupy pours

CONCRETE FOOTING MATH

Frequently Asked Questions

How many 80-lb bags of concrete fill a 12-inch × 4-foot Sonotube?

A 12-inch diameter, 48-inch deep cylinder holds 3.14 cubic feet of concrete. Because one 80-lb bag yields 0.60 cubic feet, you need roughly 5.2 bags—so plan on 6 bags per footing with a 10% spillage allowance.

How wide should a fence post hole be for a 4×4 post?

Dig the hole about 3 times the width of the post (roughly 10 to 12 inches wide for a 4×4) and at least 1/3 of the post’s above-ground height deep, extending below your local frost line.