1. Standard Bag Yields
Bag counts always round up to the next whole bag using industry-standard ASTM yields: 0.60 ft³ per 80-lb bag, 0.45 ft³ per 60-lb bag, and 0.30 ft³ per 40-lb bag.
THE TOOLBOX / HOME DIY & CONSTRUCTION
Calculate ready-mix cubic yards, 80-lb / 60-lb / 40-lb premix bag counts, total weight, and estimated cost for patios, driveways, sidewalks, and round post holes.
Total Concrete Needed (incl. 10% waste)
POUR THICKNESS & COVERAGE
| Project Type | Typical Thickness | Coverage per yd³ | Practical Tip |
|---|---|---|---|
| Sidewalk / Walkway | 4 inches | 81 sq ft / yd³ | Standard pedestrian load |
| Backyard Patio | 4 inches | 81 sq ft / yd³ | Add rebar or wire mesh for crack control |
| Residential Driveway | 5 inches | 65 sq ft / yd³ | Thicken edges to 6" for heavier vehicles |
| Heavy-Duty / RV Pad | 6 inches | 54 sq ft / yd³ | Use 4,000 PSI mix & #4 rebar grid |
Bag counts always round up to the next whole bag using industry-standard ASTM yields: 0.60 ft³ per 80-lb bag, 0.45 ft³ per 60-lb bag, and 0.30 ft³ per 40-lb bag.
For small fence-post jobs, premix bags save delivery fees. Above 1.5 cubic yards, a ready-mix truck usually beats bags on both price and physical effort.
Multiply post-hole volume across 6, 8, or 20 piers in one click—ideal for decks, pergolas, mailboxes, and privacy fences.
Measure patios and flooring in Square Footage Calculator, convert feet/meters in Unit Converter, or work with tape-measure fractions in Fraction Calculator.
One cubic yard equals 27 cubic feet. An 80-lb premix bag yields about 0.60 cubic feet (45 bags per cubic yard), a 60-lb bag yields 0.45 cubic feet (60 bags per cubic yard), and a 40-lb bag yields 0.30 cubic feet (90 bags per cubic yard).
Standard walkways and backyard patios are poured 4 inches thick. Residential driveways and garage slabs carrying passenger vehicles are typically 4 to 5 inches thick (6 inches for heavy trucks or RVs).
Uneven gravel subgrades, slight form bowing, and wheelbarrow or chute residue routinely consume 5% to 10% more concrete than exact geometric math. Ordering 10% extra prevents running short mid-pour.
Once a project exceeds roughly 1.5 to 2 cubic yards (about 65 to 90 eighty-pound bags), a ready-mix delivery truck usually costs less than bagged concrete and eliminates hours of heavy lifting and mixing.
Switch to the "Round Post / Sonotube" tab, enter the hole diameter in inches, depth in inches, and total number of holes. The calculator computes π × r² × depth × quantity automatically.
Normal-weight concrete weighs roughly 150 pounds per cubic foot, or about 4,050 pounds (2.025 tons) per cubic yard.
Yes. Alongside cubic yards and cubic feet, the results dashboard automatically converts your total concrete volume into cubic meters (m³).